Centre Road is a major traffic artery in Greenville, Delaware which is on the western fringes of the City of Wilmington. Technically known as SR 141, Centre Road connects major population areas of the northern and western suburbs of Wilmington with industrial and residential areas as well as providing access to I-95. This 1.4 mile long section of SR 141 was deteriorating and a rehabilitation of the existing concrete...
Read MoreThe I-95/SR 896 Interchange is a major interstate exit for the city of Newark, Delaware and is located approximately 2.5 miles from the Delaware/Maryland state line. Major congestion frequently occurs at the interchange as well as on I-95 and SR 896 during peak rush hours and other times due to both commuter and pass-thru traffic on the heavily traveled I-95 interstate corridor. The frequency of these traffic problems has increased...
Read MoreThe Christina River Bridge at the Wilmington, Delaware Riverfront is a new 470’ multi-modal bridge over the Christina River that includes two twelve ft. (2-12’) travel lanes and shoulders, as well as a fourteen ft. (14’) wide bicycle/pedestrian path. The path will connect to the Riverfront walkway as well as other bicycle/pedestrian facilities in the area. The project extends from the area near Frawley Stadium across the Christina...
Read MoreSR 141/Centre Road Rehabilitation, Greenville, DE Centre Road is a major traffic artery in Greenville, Delaware which is on the western fringes of the City of Wilmington. Technically known as SR 141, Centre Road connects major population areas of the northern and western suburbs of Wilmington with industrial and residential areas as well as providing access to I-95. This 1.4 mile long section of SR 141 was deteriorating...
Read MoreThe project includes the design of a proposed taxiway at the Delaware Coastal (DCA). N&W is the Geotechnical Engineer of Record and to date has completed the drilling, and field CBR tests. We are currently performing lab testing for the taxiway pavement design. The field work consisted of thirty-eight (38) test borings and four (4) field CBR tests. The drilling consisted of approximately 360 feet of continuous SPT sampling and 25...
Read More