Projects


N&W provided services to the Logan Township Planning Commission related to the planning, design, and construction of the proposed Chestnut Flats Wind Energy Project located in Logan Township, Blair County, Pennsylvania. Chestnut Flats Wind, LLC proposed to construct nineteen (19) 2.0 megawatt wind turbines capable of providing up to 38 megawatts of electric power to the local power grid. Turbines are proposed to be constructed on...

Read More

Rights-of-way and edges of existing county cartways, driveways, structures, access roadways, swales, power utility poles, gas lines and physical features were surveyed and mapped for 4.5 miles to select alignment for construction of a natural gas line in Owego, Tioga County, New York. The plans were prepared and alignments were reviewed based on topographical and physical features. Details of existing drainage features were included...

Read More

Navarro & Wright Consulting Engineers, Inc. (N&W), with its subconsultant Past Forward Architecture (PFA), is assisting Comcast Spectra in its efforts to refurbish and preserve the Adrian Phillips Ballroom at historic Boardwalk Hall in Atlantic City, New Jersey. The Ballroom is housed in historic Boardwalk Hall (formerly the Atlantic City Convention Hall), a monumental 1929 structure that is listed on the National Register of...

Read More

Navarro & Wright Consulting Engineers, Inc. provided precision layout for the installation of new rails for the Washington Metropolitan Area Transit Authority, along the Blue Line Extension between the Addison Road Metro Station and the new stations in Largo. Offsets for top of rail vertical and horizontal placement were provided at 10 foot intervals. This work, included recovering control, coordination with the detail build...

Read More

Owner: Pennsylvania Turnpike Commission Client: S.A.I. Consulting Engineers Location: Middlesex Township Cumberland County, PA The purpose of this project was the total reconstruction and widening of the Pennsylvania Turnpike between the Blue Mountain Tunnel (mile post 199) and to the Carlisle Interchange (mile post 226).  This large scale (27 mile long project) involved the replacement of the Blue Mountain Interchange, replacement of...

Read More