Comprehensive municipal services were provided as the Halifax Township Engineer, including the preparation of a Capital Improvement Plan to assist the Township in identifying needed infrastructure improvements and management of the Township’s Liquid Fuels fund. A comprehensive survey was completed of all roads, bridges and drainage facilities in Township; documented apparent shortfalls; developed improvement recommendations; and...
Read MoreAs the Borough Engineer of Elizabethville, stormwater drainage and roadway improvement needs are addressed on routine assists. The assistance provided leverages the strengths of Borough personnel by providing 8 1/2” x 11” plan sketches and details to allow cost effective construction without extraordinary design fees. Permits were obtained on behalf of the Borough from the Dauphin County Conservation District and the PA Department of...
Read MoreThis project involved the development of a master plan for an existing 22-acre park, which featured baseball diamonds, a playground, a municipal pool and picnic pavilions. County and state permits were obtained for the stream relocation required for the new baseball fields. The plan included the following improvements: Two new baseball fields. A new trail network. Replacement of an aged storm drainage system. The following services...
Read MoreThis design/build contract involved four design/build bridge replacements. SR 381-U10 is a single span pre-stressed concrete box beam superstructure supported on integral abutments, and was built using half-width construction. SR 982-D10 and SR 982 F10 existing structures were replaced with precast box culverts, and SR 4008-B10 is a pre-cast adjacent box beam bridge under fill superstructure replacement. The following services were...
Read MoreThis design/build bridge replacement project consisted of the design of a twospan, pre-stressed concrete spread box beam bridge. The bridge carrying SR 1054 over Indian Creek was built using half width construction and has two 60’-0” spans. The beam spacing and bridge width were revised to eliminate the need for a temporary support of the existing structure during half-width construction, allowing the contractor to save time and...
Read More