This project involved the design of a 13,000 GPD wastewater treatment plant to replace an out-of-date facility at Denton Hill State Park. Peak flows at the park, which is home to a downhill ski area, occur in the wintertime, so the treatment plant was designed to accommodate extremely low flow conditions during the off season. The package plant included SBR technology and a UV disinfection unit.
The following services for the project:
- Development of treatment process needs.
- Concept treatment system design.
- Site design.
- Permit application for new stream discharge.
- Periodic construction inspection.
- System startup assistance.