E02313 General Designer Open End, WO #2 — SR 519 Roundabouts Final Design


E02313 General Designer Open End, WO #2 — SR 519 Roundabouts Final Design

For the final design of two multi-lane roundabouts on SR 519 services were provided as part of an open-ended engineering services contract. The roundabouts are located approximately 400’ apart at the intersections with SR 1055 northbound and SR 1055 southbound. While this innovative design was set to improve traffic flow and relieve congestion at these intersections, it has also left the smallest project footprint on the topography of the area.

The following services were provided for the project:

  • Project Management/Project Administration.
  • Administration and Inspection of Roadway Borings.
  • Soil testing.
  • Final Geotechnical Engineering Report.
  • Utility Coordination.
  • Erosion & Sedimentation Control Plan.
  • NPDES Permitting.
  • Supplemental Surveys.