Featured Projects
Browse all of our engineering projects, or view projects by service area using the links to the right.
Pittsburgh International Airport Terminal Modernization
Navarro & Wright Consulting Engineers, Inc. (N&W) is providing structural engineering services as a subconsultant for a new terminal that will be built adjacent to the current airside facility between Concourses C and D. The design consolidates check-in, ticketing, security, and baggage operations into one connected facility. While still subject to change over subsequent project phases, the design currently features separate levels for departing and arriving passengers, a nonpublic level for building systems like baggage belts,...
read moreLancaster Laboratories Buildings O and P
N&W’s Structural Services Group is providing full service engineering for Eurofins Lancaster Labs growing facility in Lancaster, PA. Building “O” is 5-story, 135,000 SF facility which will provide comprehensive laboratory services for the world’s largest pharmaceutical and biopharmaceutical companies. Building “P” is a 6-story, 165,000 SF facility which will serve as consolidated office space for the campus. The buildings’ structure consists of structural steel frames, metal deck and concrete floors, metal deck roofs, and shallow spread...
read moreEvaluating Annual Precipitation Using Climate Projections to Assess Future Climate Risks for Transportation Infrastructure
N&W’s client chose us to develop and document a process for collecting and evaluating projected mean daily precipitation from an ensemble of global climate models. This data was intended to inform Pennsylvania Department of Transportation (PennDOT) assessments of potential flooding vulnerabilities and climate risks related to transportation infrastructure. These assessments were intended to build upon PennDOT’s 2017 Extreme Weather Vulnerability Study and the hydrologic and hydraulic (H&H) assessments that are typically conducted by...
read moreDelaware & Lehigh National Heritage Corridor Project
The Delaware & Lehigh National Heritage Corridor (D&L) stretches from Wilkes-Barre to Bristol, PA, and integrates trails, canals, railroads, historic and recreational resources, public and private partnerships, resource conservation, and more, defining a rich pathway through some of the Eastern Seaboard’s most beautiful landscapes and a journey through some of the most significant time periods and milestones in our nation’s history. Navarro & Wright Consulting Engineers, Inc. (N&W) is partnered with D&L under a three (3)...
read moreNBIS Bridge Inspection
Millions of Americans cross our nation’s 600,000 bridges each day and more than 47,000 bridges in the U.S. are in poor condition, classified as structurally deficient and in need of urgent repairs. Local and state agencies are in need of experienced, certified and qualified consultants to help inspect these bridges. N&W provides bridge inspection services for federal, state, county, and private-owned bridges in accordance with National Bridge Inspection Standards (NBIS). Our bridge inspection projects are led by registered...
read moreSR 141/Centre Road Rehabilitation, Greenville, Delaware
Centre Road is a major traffic artery in Greenville, Delaware which is on the western fringes of the City of Wilmington. Technically known as SR 141, Centre Road connects major population areas of the northern and western suburbs of Wilmington with industrial and residential areas as well as providing access to I-95. This 1.4 mile long section of SR 141 was deteriorating and a rehabilitation of the existing concrete pavement was scheduled by DelDOT. This section of road is a 4-lane divided highway with a mixed...
read moreI-95/SR 896 Interchange Project, Newark, Delaware
The I-95/SR 896 Interchange is a major interstate exit for the city of Newark, Delaware and is located approximately 2.5 miles from the Delaware/Maryland state line. Major congestion frequently occurs at the interchange as well as on I-95 and SR 896 during peak rush hours and other times due to both commuter and pass-thru traffic on the heavily traveled I-95 interstate corridor. The frequency of these traffic problems has increased over a prolonged period of time. Traffic safety is another major issue at this particular exit. The I-95/SR...
read moreChristina River Bridge, Wilmington, Delaware
The Christina River Bridge at the Wilmington, Delaware Riverfront is a new 470’ multi-modal bridge over the Christina River that includes two twelve ft. (2-12’) travel lanes and shoulders, as well as a fourteen ft. (14’) wide bicycle/pedestrian path. The path will connect to the Riverfront walkway as well as other bicycle/pedestrian facilities in the area. The project extends from the area near Frawley Stadium across the Christina River to its east bank in the vicinity of Market Street/Walnut Street split of Business US 13 which leads to the...
read moreDelDOT – Construction Inspection Services Projects
SR 141/Centre Road Rehabilitation, Greenville, DE Centre Road is a major traffic artery in Greenville, Delaware which is on the western fringes of the City of Wilmington. Technically known as SR 141, Centre Road connects major population areas of the northern and western suburbs of Wilmington with industrial and residential areas as well as providing access to I-95. This 1.4 mile long section of SR 141 was deteriorating and a rehabilitation of the existing concrete pavement was scheduled by DelDOT. This section of road is a...
read moreDelaware Coastal Airport Construct Parallel Taxiway D, Georgetown Delaware
The project includes the design of a proposed taxiway at the Delaware Coastal (DCA). N&W is the Geotechnical Engineer of Record and to date has completed the drilling, and field CBR tests. We are currently performing lab testing for the taxiway pavement design. The field work consisted of thirty-eight (38) test borings and four (4) field CBR tests. The drilling consisted of approximately 360 feet of continuous SPT sampling and 25 of unsampled footage to obtain bag samples for CBR testing. We mobilized our track-mounted Acker Scout rig to...
read more