Government Projects


Government – Municipal, State, and Federal Projects

P3 Rapid Bridge Replacement Program

P3 Rapid Bridge Replacement Program

The Pennsylvania Department of Transportation (PennDOT) utilized a Public Private Partnership (P3) delivery method to replace 558 of approximately 4,000 structurally deficient bridges in just three years. Working for several contract holders, Navarro & Wright Consulting Engineers, Inc. (N&W) provides geotechnical engineering, environmental assessment, survey, civil engineering, and noise and air quality services for bridges located throughout the Commonwealth.

read more

Lancaster Airport Runway and Taxiway Improvement

Lancaster Airport Runway and Taxiway Improvement

The Lancaster Airport was granted funds from the American Recovery and Reinvestment Act of 2009 (ARRA) through the Federal Aviation Administration to rehabilitate Runway #8, Taxiway “A,” and Taxiway “N” at the Lancaster Airport.  The grant for the project was $3,250,000.00.  The project was funded 100% through ARRA.  Navarro & Wright was selected to provide Geotechnical services for this project to include acceptance testing services of the approximately 15,000 cubic yards of embankment, 20,000 tons of P-154 aggregate subbase and 50 cubic...

read more

Steelton Streetscape

Steelton Streetscape

Navarro & Wright Consulting Engineers, Inc., surveyed, mapped and designed approximately 6000 lineal feet of existing State and Borough roadways for a beautification project in the Borough of Steelton, Dauphin County, Pennsylvania. The site includes roadways, curbs, sidewalks, trees, utilities, traffic signals, 50 businesses and 100 residential properties. The design included the coordination and selection of materials, trees and utilities such as new street lights with underground electrical conduits and wiring extending from existing...

read more

Steelton Water Tank Rehabilitation

Steelton Water Tank Rehabilitation

Navarro & Wright Consulting Engineers, Inc. provided design bidding documents and construction phase services for the rehabilitation of the two 2 MG ground storage tanks.

read more

Commerce Bank Stadium City Island, Harrisburg

Commerce Bank Stadium City Island, Harrisburg

Navarro & Wright provides surveying services and subsurface investigation/core borings for the renovations and additions to the Riverside Stadium Complex on City Island in Harrisburg.

read more

Carlisle Stryker Brigade Readiness Center and Field Maintenance Shop

Carlisle Stryker Brigade Readiness Center and Field Maintenance Shop

Navarro & Wright Consulting Engineers, Inc. provided surveying services at the Carlisle Armory to Lobar Associates for the new 37,238-square-foot Readiness Center and the new, 25,080-square-foot Field Maintenance Shop. N&W provided stakeout for buildings and all infrastructure including parking lots, storm sewer, retention ponds, sanitary sewer, gas lines, and water lines.  Navarro & Wright fees totaled to $40,000.  Construction cost for the total project was estimated around $16 million.

read more

Washington Suburban Sanitary Commission Water Storage Tank As-builts

Washington Suburban Sanitary Commission Water Storage Tank As-builts

Navarro & Wright is currently teamed with Tank Industry Consultants to provide engineering services for five tanks located in Montgomery County, MD including Cabin John, Glenmont, Fort Washington, and two Patuxent Reservoirs.  Navarro & Wright has conducted site visits to verify that improvements to each tank were completed in conformance with all contract documents.  N & W staff have collected field measurements and conducted surveys to date in order to complete inspection of all repairs and additions on each tank.  N & W...

read more

PA Turnpike Commission – Western Expansion Projects

PA Turnpike Commission – Western Expansion Projects

N&W provided Inspection Services as part of this Open End Contract with the PTC for Western Expansion Projects MP 0.00 to MP 247.00 and James E. Ross Highway, Amos K. Hutchinson Bypass and Mon/Fayette Expressway.  Performed construction inspection services on several work orders consisting of MP 151.09 – All aspects for the removal and replacement of new bridge, MP 180 to MP 186 Concrete Roadway Rehabilitation, Joint Stabilization, Milling, and Bituminous Paving Overlay of four lane divided highway, MP 30 to MP 44.8 Roadway...

read more