Projects


Featured Projects

Browse all of our engineering projects, or view projects by service area using the links to the right.

South Hanover Township Municipal Complex

South Hanover Township Municipal Complex

Navarro & Wright Consulting Engineers, Inc. (N&W) is the site civil engineer & landscape architect for this new municipal complex based on a building area of 24,000 square feet. The site design includes a new township administration building, new fire/EMS building, athletic fields, associated parking facilities, stormwater management facilities and access drives on a 12 acre site for South Hanover Township. N&W services include land survey, wetland delineation, a Phase I archaeological study, traffic study and PennDOT Highway...

read more

P3 Rapid Bridge Replacement Program

P3 Rapid Bridge Replacement Program

The Pennsylvania Department of Transportation (PennDOT) utilized a Public Private Partnership (P3) delivery method to replace 558 of approximately 4,000 structurally deficient bridges in just three years. Working for several contract holders, Navarro & Wright Consulting Engineers, Inc. (N&W) provides geotechnical engineering, environmental assessment, survey, civil engineering, and noise and air quality services for bridges located throughout the Commonwealth.

read more

English Center Tannery

English Center Tannery

Navarro & Wright Consulting Engineers, Inc. (N&W) assisted Professional Services Industries, Inc. (PSI) and Verizon, Inc. by conducting a limited Phase II excavation of the former English Center Tannery in Pine Township, Lycoming County, Pennsylvania. Because a unique set of circumstances combined to limit Verizon’s options for locating the proposed cell tower, Verizon authorized and approved a Phase II work plan designed to recover archaeological and archival information on the tannery. To keep Verizon’s construction...

read more

Lancaster Airport Runway and Taxiway Improvement

Lancaster Airport Runway and Taxiway Improvement

The Lancaster Airport was granted funds from the American Recovery and Reinvestment Act of 2009 (ARRA) through the Federal Aviation Administration to rehabilitate Runway #8, Taxiway “A,” and Taxiway “N” at the Lancaster Airport.  The grant for the project was $3,250,000.00.  The project was funded 100% through ARRA.  Navarro & Wright was selected to provide Geotechnical services for this project to include acceptance testing services of the approximately 15,000 cubic yards of embankment, 20,000 tons of P-154 aggregate subbase and 50 cubic...

read more

State Correctional Institution, Coal Township

State Correctional Institution, Coal Township

PA DGS Project No. DGS 375-3: Construction of a New 128-Cell L-3 Close Security Housing Unit.  The proposed project includes the renovations to the existing expansion of the prison site, on-site testing of concrete cylinder testing and compaction testing using the Troxler gauge.  Services include placement of fill soils, placement of aggregate subbase, placement of asphalt, placement of concrete, drilling of caissons, and field and laboratory testing of concrete as well as laboratory testing of soils for construction.  N&W team includes...

read more

Felton Lofts

Felton Lofts

The project involved the redevelopment and conversion of the vacant Steelton Elementary School Campus into a 83 unit apartment complex.  The focus of the project was maintain, and enhance, the existing architecture of the nearly 100 year old school buildings.  The site design included modifying the existing paved exterior to provide onsite parking and green open space.  The project also required compliance with federal and state funding agencies who were providing the developer with financing for the project.  Navarro & Wright also...

read more

Fulling Mill Retirement Community

Fulling Mill Retirement Community

  N&W provided professional engineering and land surveying services to JPM Keller (Owner) that were associated with the preparation of Preliminary and Final Land Development Plans for a residential retirement community consisting of approximately eighty-four (84) condominium units and associated buildings and commercial development situated on twenty-eight (28) acres located in Lower Swatara Township, Dauphin County, Pennsylvania.  N&W provided geotechnical services including drilling services, drilling inspection, lab testing...

read more

100+ Miles Natural Gas Gathering Lines Project

100+ Miles Natural Gas Gathering Lines Project

N&W has provided engineering design, environmental, permitting, and surveying services for 100+ miles of natural gas gathering lines. These projects required boundary and topographic survey, wetland delineations, cultural resources, geotechnical engineering, Right-of-Way acquisition, expedited ESCGP permit approvals, PA DEP Chapter 105  or USACE Joint Permit approvals, PennDOT Highway Occupancy Permits (HOP), construction stakeout, and construction documents.  ArcGIS was utilized to develop scouting maps, to perform utility corridor...

read more

Pike Egress Natural Gas Gathering Line

Pike Egress Natural Gas Gathering Line

N&W served as the design consultant for t 78,500 linear feet of 16-inch low pressure and 20-inch high pressure natural gas gathering lines and associated spur lines in Bradford County, PA for Talisman Energy USA. N&W was responsible for the effective implementation of the project from conception, routing, field investigations, and design through to permitting and construction.    In total, this project included tie-ins to 16 separate well pads.  Project included a dual 16-inch and 20-inch trunk line and associated 12-inch, 10-inch,...

read more

Quest Eastern Resources, LLC Pipeline

Quest Eastern Resources, LLC Pipeline

Navarro & Wright Consulting Engineers conducted surveying, mapping and environmental wetlands field views for a proposed 2.2 mile natural gas pipe line in the Marcellus Shale areas of Steuben County, New York.  We prepared a General Permit Application and an Army Corps of Engineers permit submittal with documentation.  Rights-of-way plans with bordering property owners were shown for the alignment.  The pipe line also crossed an existing gas line for which profile plans were prepared showing  approximate crossing depths.  Dig Safely New...

read more