Institutional


Navarro & Wright is providing civil and structural engineering services as a subconsultant on this contract. This project involves the demolition of several existing armory buildings and construction of new buildings and additions to existing buildings for technical training in HVAC/Refrigeration, Machine Tool Technology and Metal Fabrication/Welding programs. Project consists of four single-story additions totaling 50,000 SF and...

Read More

The Seven Sorrows of the Blessed Virgin Mary Educational Center involved the construction of a 3-story classroom wing addition, a connecting corridor between the new and existing buildings, a new singlestory classroom building between the addition and existing building, and an elevator tower servicing the original structure. The project totaled approximately 20,000 SF of demolition, 8,000 SF of renovations, and 36,000 SF of new...

Read More

The North Village II housing complex is the newest of Allegheny College’s on-campus student dormitories. The 4-story building is located on an 1.5-acre site and can accommodate 230 upperclassmen in 81 double and quad units. Allegheny College has made a commitment to sustainability, with a goal that all new construction on campus will attain a minimum of LEED Silver certification, and that 100% of the campus’s electricity will be...

Read More

The Benedictine Sisters of Pittsburgh desired to build a new convent that would provide improved accessibility and more efficient use of space than their old, multistory facility. The new 27,000 SF, one-story facility contains living quarters, an activities room, a cafeteria, offices and a worship center. The new convent is located on a steeply sloped, 11.8 acre hilltop property and includes sustainable features such as a geothermal...

Read More

Salk Hall, built in 1941, originally housed the Pittsburgh Municipal Hospital before being acquired by the University of Pittsburgh in 1957. The University constructed an 80,000 SF research tower addition in the parking area behind the original structure to house laboratories and support space. In addition to the 4-story building, site improvements now include parking, walks, and stormwater management. The following services were...

Read More